Find the work you performed but never billed.

Your costs are current. Your billing is not. RevDetective compares what you have spent and completed against what you have invoiced and collected, then ranks every gap in dollars.

Free to try. No account. Your files never leave your computer.

Job J-2201 — Sheet Metal, Building B

Cost incurred against revenue billed, by month
cost to date · 80% billed to date · 68% $240,000 unbilled
One job, twelve points of completion ahead of its billing. That gap is cash you have already spent and can invoice on the next pay application.

Where contractors leak revenue

Not theory. These are the gaps that show up when you put a job cost report, a change order log and an AR aging next to each other.

Underbilling

A job is 80% complete and 68% billed. The crew did the work, the costs are on the books, and twelve points of contract value is sitting there unbilled. RevDetective finds every job where cost progress has run ahead of billing progress, and tells you what to add to the next pay application.

Change orders that were approved and never invoiced

The easiest money in construction. It is signed, nobody disputes it, and it simply never made it onto a billing. No negotiation required — just an invoice.

Work performed on change orders nobody approved

Cost is accumulating against a change order still sitting in someone's inbox. Every week it ages, it gets harder to collect. Findings are sorted by how long the work has been exposed.

Margin fade, cost overruns, AR and retainage

Jobs whose projected margin has slipped against the estimate, costs running past budget, invoices past ninety days, and retainage you have earned but nobody is holding to a release date. Shown separately from billable work, because they are not the same kind of money.

Three exports and about a minute

No integration, no implementation, no call with a sales engineer. Load one file or all three — each works on its own.

Export what you already run

A job cost or WIP report, a change order log, an AR aging. From Sage, Foundation, Vista, Spectrum, Procore, Buildertrend or a spreadsheet. Column names do not need to match anything — they are matched ignoring case, spaces and underscores.

Drop them in

The analysis runs in your browser. Every job is compared against its own budget, billing and completion, and every change order against its cost and status.

Bill, chase, or write it off

You get a dollar-ranked list with the biggest recoverable items first. Assign one to someone, set a date, and record what you actually collect.

Your job costs stay on your computer

RevDetective runs entirely in the browser. Your files are read into memory on your own machine, analysed there, and never uploaded. There is no server to send them to. No account, no login, nothing for your GC or your competitors to request. Close the tab and the data is gone.

The practical version: you can run your whole WIP schedule through this on a Friday afternoon without asking anyone's permission.

Built for trade contractors

Job-based work where costs land before billing does, and change orders move faster than paperwork.

HVACElectricalPlumbingMechanical Sheet metalConcreteRoofingFlooring Fire & securityCivilRestorationSpecialty trades

Most useful to the person who closes the month — a controller, an owner who still signs the billings, or a fractional CFO carrying several contractors at once.

You already did the work. See what is still sitting unbilled.

Sample data is loaded and ready, so you can see exactly what it finds before you export anything of your own.

Open RevDetective